Archive | Case Studies

Case Study: Ivory Lane Walkway Replacement Fortitude Valley, Queensland, Australia

During routine maintenance inspections, Brisbane City Council (BCC) determined that the 22.0m long elevated walkway at Ivory Lane, Fortitude Valley required replacement due to the deteriorating timber structure. The boardwalk was elevated on posts with the boardwalk deck generally 1.0m to 2.0m above a sloping area which adjoins the base of a dry-packed stone retaining […]

Continue Reading